Disaster Atlas · Rapid impact assessment · Rasuwa & Nuwakot, Nepal

Bhote Koshi Flash Flood Impact and Exposure Atlas

An ice and rock avalanche in the Lhende Khola sent a debris flood 62 km down the Bhote Koshi and Trishuli on 26 August 2026, from the Tibetan border to Devighat. This atlas places every reported impact on that line and against the terrain - a source-cited damage register paired with a Copernicus-DEM height-above-channel exposure envelope.

26 August 2026, 02:52 UTC / 08:37 NPT
USGS us7000tbwb - event-type: landslide, Ms 5.2
62.4 km flood path, 1,339 m fall
Rasuwa & Nuwakot districts, Nepal
Height-above-channel envelope - damage register - exposed settlements and main-stem bridges
Height above channel
within 10 m
10 - 20 m
20 - 40 m
40 - 80 m
Flood path (main stem)
Hydropower
Transmission
Border infrastructure
Settlement
Main-stem bridge
Data Package
ZIP - 6 GeoPackages + FGDC metadata + 7 CSVs + 5 GeoJSONs + HAND GeoTIFF + PDF + manifest + verification log
PDF Report
PDF - methodology, findings, damage register, channel profile, sources
Cite this dataset: doi:10.5281/zenodo.22118799

Errata & CorrectionsKnown Issues With This Dataset

Keystone GIS documents known data issues here rather than silently revising published datasets.

177
Confirmed dead, Nepal (27 Aug)
629+
Still missing
62.4 km
Flood path
39.4 km2
Valley floor within 80 m of river
17,167
Residents in envelope (lower bound)

OverviewWhat Happened, and What This Records

At 02:52:10 UTC on 26 August 2026 (08:37 Nepal time) an ice and rock avalanche fell into the Lhende Khola, a Bhote Koshi tributary rising in Gyirong County, Tibet. The United States Geological Survey catalogued the seismic signal as event us7000tbwb and, after long-period waveform analysis, classified it not as an earthquake but explicitly as event-type 'landslide' — the catalogue entry is titled 'M 5.2 Landslide — 55 km NW of Kodari, Nepal', at 0 km depth. Nepali officials had initially attributed the flood to a magnitude 4.4 earthquake.

The flood entered Nepal at the Rasuwagadhi border crossing and ran 62.4 km down the Bhote Koshi and Trishuli to Devighat, falling 1,339 m at a mean gradient of 21.5 m per km. There had been no rain and no warning. As of 27 August, 177 people are confirmed dead in Nepal and 3 in Tibet. Nepal Police record the dead as 41 women, 69 men, 10 girls and 7 boys, with 50 of the 177 still unidentified. Bodies have been recovered not only in Rasuwa and Nuwakot but downstream in Dhading, Gorkha, Chitwan, Tanahun and East Nawalparasi - far beyond the 62 km reach where structural damage was reported. 336 people have been airlifted out of Timure, Dhunche and Mailung, 45 of them foreign nationals.

This atlas pairs a source-cited register of reported damage with a Copernicus-DEM height-above-channel envelope, so every claim about what was hit can be checked against where it sits relative to the river. Sixteen damage records, 13 exposed settlements, 38 main-stem bridge crossings, 28.5 km of the Pasang Lhamu Highway and five of the six damaged Nepal Electricity Authority facilities are placed on the same 62 km line.

Why This DatasetThe Problem It Solves

In the first days after a Himalayan flood, the damage picture arrives as a list of place names in news copy and agency statements. It is rarely georeferenced, almost never height-referenced, and impossible to reconcile with what the terrain would allow. That makes it hard to answer the questions responders actually have: how far above the river was this settlement, how much of the valley floor could plausibly have been reached, and how many people lived on it.

This product does the reconciliation. Every reported impact is georeferenced from a named open feature — not from the news text — and then intersected against a terrain surface. Where the two disagree, the disagreement is published rather than smoothed over: Dhunche's reported flooding turns out to be tributary flooding 733 m above the main stem, and the Trishuli 3B hub substation sits 20 km from the river, where direct inundation is implausible.

MethodologyHow It Was Built

Flood path. The main stem was assembled from OpenStreetMap waterway=river ways named Bhote Koshi, Trishuli River, Trishuli Ganga River and Trisuli, linemerged, and the longest continuous component taken: 62.42 km from 28.2781 N, 85.3770 E at the border to 27.8666 N, 85.1127 E at Devighat.

HAND(pixel) = DEM(pixel) − DEM(nearest channel cell)
envelope(b) = { HAND ≤ b m } ∩ { distance to channel ≤ 2,500 m },  b ∈ {10, 20, 40, 80}

Copernicus GLO-30 tiles N27_00_E085 and N28_00_E085 were mosaicked to the corridor at roughly 29 m pixels. The channel was rasterized, a Euclidean distance transform with index return gave every pixel the elevation of its nearest channel cell, and subtraction produced the height-above-channel surface. The 80 m band is not arbitrary: reporting records floodwaters reaching settlements about 80 m (270 ft) above river level, and the chief customs officer at Timure described a wave “rising like a wave nearly 100 metres high”.

Population. WorldPop 2020 UN-adjusted unconstrained counts were reprojected onto the DEM grid by density-preserving bilinear resampling. The constrained BSGM raster was tested first and rejected: it sums to 25.3 million against a UN 2020 total of 29.1 million, has only 272,253 valid pixels nationally, and places 35,449 people in a single 92 m cell.

Damage register. Each of the 16 records is georeferenced independently of the damage claim, from OSM, Wikidata, Wikipedia coordinates or Wikipedia GeoSearch, and carries that source, a location_confidence flag and an evidence URL. Nothing is inferred: where a coordinate could not be established from a named open feature, that is recorded rather than estimated.

Key FindingsWhat the Data Shows

Damage RegisterWhat Was Reported Destroyed or Damaged

AssetRiver kmAbove channelReported impact
Rasuwagadhi / Gyirong Port crossing0.016 mCustoms office destroyed; 300+ vehicles queued at the checkpoint washed away; road, comms and power to Gyirong Port cut on the Chinese side
Timure3.440 mFirst settlement struck; bazaar and much of the settlement swept away; 9 Armed Police Force personnel at the border outpost missing
Rasuwagadhi HEP (111 MW)5.033 mDamaged; generation halted (NEA)
Chilime HEP powerhouse (22 MW)12.47 mDamaged; generation halted. Intake and peaking reservoir sit 380 m higher on the Chilime Khola
Syabrubesi14.737 mMarkets and settlement damaged; the 16 km Chinese-grant two-lane road upgrade swept away; road supervisors unaccounted for
Dhunche22.3733 m*Floodwater entered the settlement — tributary flooding on the Trishuli Khola, not main-stem inundation
Mailung32.626 mFloodwater entered the settlement
Upper Trishuli 3A (60 MW)39.0on channelDamaged; generation halted (NEA)
Betrawati45.526 mFloodwater entered; downstream end of the 42 km road stretch reported destroyed
Trishuli 3B hub 220 kV substation45.6261 m*Reported damaged by NEA, but sits 20.4 km from the main stem — more consistent with transmission damage than inundation
Trishuli HPS (24 MW)53.917 mAffected; generation and distribution structures damaged (NEA)
Bidur / Trishuli Bazaar57.166 mFloodwater entered the town; a bridge connected to Trishuli Bazaar swept away
Devighat HPS (14.1 MW)58.919 mAffected; generation and distribution structures damaged (NEA)
Devighat62.415 mFloodwater entered the settlement — downstream limit of reported structural damage

* outside the 80 m main-stem envelope. Nine bank branches along the corridor were also reported swept away with 26 staff out of contact. The full register, including the USGS seismic source record and per-record location sources, confidence flags and evidence URLs, ships in the data package.

Analytical UsesWhat You Can Do With This

LimitationsKnown Caveats

Data DictionaryFields in the GeoPackages

FieldLayerDescriptionUnits
name / categorydamage_registerAsset name and class (Settlement, Hydropower, Transmission, Border infrastructure, Seismic source)
reported_impactdamage_registerVerbatim summary of the reported damage
location_sourcedamage_registerHow the coordinate was established, independently of the damage claim
location_confidencedamage_registerhigh / medium / low
evidence_urldamage_registerSource for the damage claim
river_kmall point layersChainage along the main stem from the border at Rasuwagadhikm
hand_mall point layersHeight above the nearest channel cellm
dist_channel_mall point layersPlanimetric distance to the channelm
elev_mall point layersCopernicus GLO-30 surface elevation (EGM2008)m
band_m / area_km2 / populationenvelopeHeight-above-channel band, its area, and WorldPop 2020 residents within itm / km² / persons
main_stem_crossingbridgesTrue where the bridge centroid lies within 60 m of the main stemboolean
channel_elev_m / drop_from_source_mchannel_profile.csvLongitudinal profile at 250 m intervalsm

Jurisdiction BreakdownResults by Jurisdiction

District / unitEnvelope area (km2)Population within 80 mPopulation within 20 m
Nuwakot26.2915,8504,716
Rasuwa13.081,317680
TOTAL (Nepal main stem)39.3717,1675,396

Sources & CitationsAll Data is Openly Licensed